Accelerating the Net Zero Grid



LineVision is accelerating the net zero grid by equipping our utility partners with unique monitoring and analytics that improve the capacity, resilience, and safety of the grid.
LineVision Solutions
LineAware®
Situational Awareness - Ensure lines are within safe operating limits with real-time alerting on threats to grid reliability or public safety
LineRate® Suite
Advanced Line Ratings - Reliably and safely increase capacity on transmission lines by up to 40% with Ambient Adjusted and Dynamic Line Ratings
LineHealth®
Asset Health Insight - Improve asset management by using digital twin models to understand conductor health and prioritize maintenance of critical assets
The LineVision Difference
Global Leader in Overhead Line Monitoring
Partnered with the world's largest utility companies
Unparalleled Visibility and Insight
Collect information on all phases regardless of voltage with just one LiDAR sensor that utilizes machine learning feedback for continuous improvement
Extend your Team of Experts
Our dedicated data scientists partner directly with you to apply advanced analytics within system operations and planning
Easy Installation with No Outages
Patented non-contact sensor platform can be installed on any tower, any voltage, and any conductor type
Showcased Projects
LineRate DLR and LineAware situational awareness
Increased capacity from DLR will prevent power imports with a payback period of days while also monitoring critical sags in high-risk wildfire zones.
Using all LineVision applications for holistic grid enhancements.
DLR to reduce congestion in MISO territory, LineAware & LineHealth in Colorado wildfire risk zones to ensure public safety and system reliability.
LineHealth on transmission lines nearing end of life and in high-risk icing zone.
Assessing conductor health to ensure safe operation with increased line loading due to changing load patterns and proactive alerts on icing events.
LineRate DLR on a congested transmission line in a renewable generation rich area.
Avoided the rebuild of 30 miles of double circuit transmission, avoiding ~$46M in construction costs. Reduced wind curtailments by 320 MW.
What Our Customers Say

Contact LineVision