The Trusted Partner of Utilities Worldwide
LineVision works with 7 to the 10 largest utilities in the US and is the market leader in the UK
We are the leading provider of grid intelligence solutions that help utilities to:
What Our Partners Have to Say
Lorem ipsum
“Integrating GETs such as LineVision’s is a crucial part of National Grid’s work to increase the capacity of our network to meet increased demand. Innovative projects such as this will boost the capacity of our existing infrastructure and help increase the network’s capacity, delivering lower costs for consumers whilst continuing to maintain world-class reliability.”
Mark Lissimore, Director of Infrastructure Delivery
Lorem ipsum
“Expanding our use of LineVision’s DLR throughout our service territory is essential to strengthening our infrastructure and preparing our assets for the evolving energy landscape and impacts of extreme weather. This technology has already proved that it can bolster the reliability, capacity, affordability and clean energy deployment of our electric grid.”
Brian Guzek, Vice President of Corporate Strategy

Lorem ipsum
“We know that there's a lot of load growth happening throughout the country and in Nevada specifically finding every little megawatt of capacity out of the transmission system is super important… This project lays the foundation for increased grid resilience, increased transmission capacity, and jobs for Nevadans.”
Scott Kaufmann, Vice President of Transmission
Case Studies
National Grid in the UK faced increasing offshore wind curtailments and interconnection challenges, resulting in congestion costs to the operator and consumers. LineVision’s DLR was deployed across critical circuits and boundaries near Wales and London, optimizing transmission capacity to improve system operability. The DLR project has been successful in optimizing transmission capacity, resulting in yearly projected cost savings of over $40 million to National Grid and its customers.

DLR was implemented on a crucial 69kV transmission line connecting a generation outlet in Ohio that was experiencing frequent thermal overload. LineVision's DLR on a 69kV Ohio transmission line identified a half-mile heavily vegetated section as the thermal constraint, with DLR values falling below the current static assumptions. This insight allowed for targeted reconductoring of only one section, which would cost $400,000 and a one-week outage, instead of a $1.63 million full reconductor and five weeks of outages. This precise capital allocation allowed for a positive capacity gain from the static rating and freed up resources for other critical projects.

DLR provided 43% capacity enhancement, 2.5 months of construction avoided, at 7.6% the cost of reconductoring. The project has the potential to unlock additional carrying capacity as an alternative to certain system upgrades and integration of large commercial customers as well as renewable energy.

Avangrid partnered with LineVision to pilot DLR on two congested 230 kV transmission lines, supplying 500 megawatts of wind generation in New York. DLR implementation led to a 17% average capacity gain, with capacity exceeding seasonal ratings over 85% of the time. This optimization helps NYSEG and RG&E improve reliability, cut congestion costs, and accelerate generation integration. DLR insights have also enhanced Ambient-Adjusted Ratings (AAR) within the EMS, improving throughput capabilities in current and future AAR software.
costs

Experience with Global Grid Operators
Multiple integrated and operationalized DLR deployments with global grid operators have yielded positive results. We are the leading DLR provider in the United States and have installations in eight countries spanning Europe, Asia and Oceania.
North America









Europe




Asia & Oceania